The Last step of the construction of the USS Constitution. The warp pylons were delivered two days earlier, and now follows the connection to the rest of the ship. A bunch of Work Bee engineers move the engines slowly in their position.
Rendered in 3d Max 10 Background painted in Paint Shop Pro 7 Constitution & Shuttlecraft by Bucky Drydock and Cargo-Ship by Dave Metlesits Work Bees by me